有關(guān)于玻璃安裝的要求
l.搬運(yùn)玻璃前應(yīng)先檢查玻璃是否有裂紋,特別要注意暗裂,確認(rèn)完好后方可搬運(yùn)。
l. Before transporting glass, it is necessary to check for cracks, especially for hidden cracks. Only after confirming that the glass is intact can it be transported.
2.搬運(yùn)玻璃必須戴手套或用布、紙墊住玻璃邊口部分與手及身體裸露部分分隔,如數(shù)量較大應(yīng)裝箱搬運(yùn),玻璃片直立于箱內(nèi),箱底和四周要用稻草或其他軟性物品墊穩(wěn)。兩人以上共同搬抬較大較重的玻璃時(shí),要互相配合,呼應(yīng)一致。
2. When handling glass, it is necessary to wear gloves or use cloth or paper to cover the glass edges and separate them from the exposed parts of hands and body. If the quantity is large, it should be packed and transported. The glass pieces should be upright in the box, and the bottom and surrounding areas should be stabilized with straw or other soft objects. When two or more people work together to lift larger and heavier glass, they should cooperate with each other and respond consistently.
3.裁割玻璃,應(yīng)在指定場(chǎng)所進(jìn)行。邊角余料要集中堆放在容器或術(shù)箱內(nèi),井及時(shí)處理。集中裝配大批玻璃場(chǎng)所,應(yīng)設(shè)置圍欄或標(biāo)志。
3. Cutting glass should be carried out in designated locations. The leftover materials at the edges and corners should be centrally stacked in containers or surgical boxes, and should be promptly disposed of. Fences or signs should be set up in places where a large amount of glass is assembled in a centralized manner.
4.濟(jì)南玻璃安裝時(shí),禁止在無隔離防護(hù)措施的情況上下樓層同時(shí)操作,取出而未安裝上的玻璃應(yīng)放置平穩(wěn)。所用的小釘子、卡子和工具等放人工具袋內(nèi),隨安隨裝。嚴(yán)禁將鐵釘放在口里、安裝玻璃的樓層下方,禁止人員來往和停留。
4. When installing glass in Jinan, it is prohibited to operate up and down floors simultaneously without isolation and protective measures. Glass that has not been installed and has been removed should be placed smoothly. The small nails, clips, and tools used are placed in the tool bag and installed as needed. It is strictly prohibited to place iron nails in the mouth or below the floor where glass is installed, and personnel are prohibited from coming and staying.
5.獨(dú)立懸空作業(yè)時(shí)必須掛好帶,不準(zhǔn)一手腋下挾住玻璃,一手扶梯攀登上下。使用梯子時(shí),不論玻璃厚薄均不準(zhǔn)將梯子靠在玻璃面上操作。
5. When working independently in the air, a safety belt must be worn, and it is not allowed to hold the glass under one hand or climb up and down the ladder with the other hand. When using a ladder, regardless of the thickness of the glass, it is not allowed to operate the ladder against the glass surface.
6.安裝高處外開窗玻璃時(shí),應(yīng)在牢固的腳手架上操作或掛好帶,嚴(yán)禁無防護(hù)措施而蹲在窗框上操作。
6. When installing window glass at a high altitude, it should be operated on a solid scaffold or hung with a safety belt. It is strictly prohibited to squat on the window frame without safety protection measures.
7.天窗及高層房屋安裝玻璃時(shí),施工點(diǎn)的下面及附近嚴(yán)禁行人通過,以防玻璃及工具掉落傷人。
7. When installing glass in skylights and high-rise buildings, pedestrians are strictly prohibited from passing below and near the construction site to prevent glass and tools from falling and injuring people.
8.大屏幕玻璃安裝應(yīng)搭設(shè)吊架或挑架從上而下逐層安裝。
8. The installation of large screen glass should be carried out layer by layer from top to bottom by setting up hangers or cantilevers.
9.門窗等安裝好的玻璃應(yīng)平整、牢固,不得有松動(dòng)現(xiàn)象;并在安裝完后,應(yīng)隨即將風(fēng)鉤掛好插上插銷,以防風(fēng)吹窗扇碰碎玻璃掉落傷人。
9. The installed glass such as doors and windows should be flat, firm, and free from looseness; After installation, the air hook should be immediately hung and inserted with a bolt to prevent the window sash from breaking the glass and injuring people.
10.安裝屋頂采光玻璃,應(yīng)鋪設(shè)腳手板或采取其他防護(hù)措施。
10. When installing roof lighting glass, scaffold boards should be laid or other safety protection measures should be taken.
11.安裝完后所剩下的殘余破碎玻璃應(yīng)及時(shí)清掃和集中堆放,并要盡快處理,以避免傷人。
11. The remaining broken glass after installation should be promptly cleaned and centrally stacked, and should be disposed of as soon as possible to avoid injury.
產(chǎn)品
資訊
- 2023-06-26 感應(yīng)門正常情況介紹與運(yùn)用留心事項(xiàng)
- 2023-06-26 鋼化玻璃門應(yīng)如何選購(gòu)和安裝
- 2023-06-21 肯德基門的幾個(gè)注意事項(xiàng)
- 2023-06-19 中空百葉玻璃隔斷的組裝步驟
- 2023-06-16 玻璃隔斷的重復(fù)利用
- 2023-06-14 高隔間隔斷的設(shè)計(jì)與整體風(fēng)格要和諧搭配!
- 2023-06-12 感應(yīng)門感應(yīng)方式的特點(diǎn)
- 2023-06-09 肯德基門漏風(fēng)的問題